K.P. Meiring Company - General Contractors in Florida and Indiana

Contact us

Construction - It's no Game.

Email all proposals and questions to bids@kpmeiring.com

UPCOMING BIDS

 

Butler Place Renovation

5230 East Washington Street,

Indianapolis, IN

BIDS DUE TO KP MEIRING: Thursday April 11, 2013 at NOON EDT.

130323 Butler Place Apartments Invitation to Bid

130402 Scope of Work - Butler Place

Survey ALTA-5230eWASHINGTONst-08282006

130328 Door Schedule

130328 Electrical Schedules

130328 HVAC Schedule

130328 Kitchen Schedule

130328 Window Schedule

130401 Ceilings-Walls-Floors Schedule

130331 Demolition Ceilings-Walls-Floors Schedule

130328 Kitchen Drawings - Elizabeth Suite w/ Built-in China Cabinets

130328 Kitchen Drawings - Keelee Studio

130328 Kitchen Drawings - Pete Anthony Flat

130310 Apartment Layouts - Garden Level Units B2-B5

 

DAYSTAR CHILDCARE DD BID ESTIMATE

57 N. Rural St.

Indianapolis, IN 46201

BIDS DUE TO K.P. MEIRING THURSDAY APRIL 11, 2013 AT 3:00 PM EDT.

Daystar Childcare Invitation to Bid

Daystar CSI Codes Phase 1

Daystar CSI Codes Phase 2 &  3

Daystar IH - DD Bid Info - 03-29-13

Daystar IH - DD MEP - Narrative

Daystar IH - DD Set - 03-29-13

Daystar DE - DD Bid Info 2003-29-13

Daystar DE - DD MEP - Narrative

Daystar DE - DD Set - 03-29-13

 

______________________________________________________________________

Save Our Verterans (SOV)

Interior Tenant Improvements

101 South Parker Street

Indianapolis, IN 46201

 BID DUE EXTENDED  TO KP MEIRING: Tuesday DEC 4, 2012 @ Noon

for Architectural Trade

SOV Invitation to Bid

A0.0 - Cover Sheet & Site Layout

A1.0 - Main Level Floor Plan

A2.0 - Main Level RCP

A3.0 - Details

A4.0 - Specifications

A5.0 - Main Level Finish Plan

A6.0 - Tilt Up Elevator (Alternate Bid)

MEP is Deisgn Build - No Bids

121126 SOV ADDENDUM NO 1

121127 SOV Questions-Answers 1

Addendum 1 A2.0 Revised

Addendum 1 A3.0 Revised

Addendum 1 A4.0 Revised

 

 

 

PROJECTS THAT HAVE ALREADY BID - Pending

SJC West Augustine Park Phase 3 Addendum #3 Revised Bid Form #2

Lighthouse Medical Building

Bids Due to KP Meiring: TBA (Indefinate Hold)

Cover Page

Site Plan

Dimension Plan

Grading and Utility Plan

Site Details

Utility Details

Riverside Cottages Assisted Living

Riverside Cottages - click here for plans

Architectural Specs - click here for specifications

Electrical Specs - click here for specifications

Mechanical Specs - click here for specifications

 

CURRENT PROJECTS UNDER CONTRACT

Craine House Renovation

6130 North Michigan Road

Indianapolis, IN

Construction Plans 2-26-13

Combine-compliance-report-20121108

CDR Application

Submission Summary

AS-BUILT - Existing Plans from Nursing Home

 

Craig Park Apartments Renovation

109 Craig Park

Scottsburg, IN 47170

BIDS DUE: EXTENDED Tues June 19, 2012 @ 2:00 PM

Craig Park Apartments Location Map

Craig_Park-Plans CNA

Craig Park Revised Drawings (3)

Craig Park Master Specs

Craig Park Addendum 1

Craig Park Addendum 2

Craig Park Addendum 3

Craig Park Addendu 03-12 35 00 Casework

Craig Park Addendum 4

Craig Park Addendum 5

Craig Park Existing Conditions Pictures

East Street Flats

1239 East Street

Indianapolis, IN 46202

BIDS DUE: EXTENDED Tues June 12, 2012 @ 2:00 PM

1239 East Street Flats Civil w LSCP

1239 EastStreetFlats_UnitsAEF_04_23_12

1239 East Street Flats_Units PLANS BCD_04_23_12

1239 East Street Flats MEP Units BCD 5-25-11

MEIRING RESIDENCE

2501 South Ponte Vedra Blvd.

Ponte Vedra Beach, FL 32084

ALTERNATE ADD DOCUMENTS:

Generac 15KW Generator Owners Manual

ATS Owners Manual

Generator &Transfer Switch Pictures

CLOSED PROJECTS UNDER WARRANTY

Carburetor Lofts

1318 Shelby St.

Indianapolis, IN

 BID DUE TO KP MEIRING: Tuesday Oct 9, 2012 @ Noon

Carburetor Loft Plans

Guerin Apartments Renovations

550 North Rural

Indianapolis, IN 46201

BIDS DUE TO KP MEIRING:

Design/Build HVAC Bids Due: July 12, 2012 @ 2:00 PM

Bid for all other Trades Due: July 26, 2012 @ 2:00 PM

HVAC D/B Guerin Bid Plans (Bidding Closed on HVAC)

Guerin Spec Book BID SET

Guerin Plans BID SET

Guerin Addendum 1

Guerin Addendum 2

Building L - Renovations

33 Moore Ave

Indianapolis, IN 46201

BID PACKAGES DUE: Thurs May 17, 2012 @ 2:00 PM

     BID PACKAGE 1 - ROOFING

     BID PACKAGE 4 - ELECTRICAL

     BID PACKAGE 5 - PLUMBING

     BID PACKAGE 6 - HVAC

     BID PACKAGE 7 - FIRE SUPPRESSION

Building L Invitation to Bid

Building L - Bid Plans

Building L- Phase 1 Project Manual

ADDENDUM NO 1

ADDENDUM NO 2

ADDENDUM NO 3

ADDENDUM NO 4

PHOTOS

     Aerial 1 Roof

     Aerial 2 Site

PHOTOS of old PR Mallory Office Building for Alt Roofing Bids

     PR Mallory Main Office Bldg Front Elevation

     PR Mallory Main Office Bldg Aerial

     PR Mallory Main Office Bldg Roof Photos

 

SEND Residential Projects:

970 Elm Street:

 

Burton Apartments Renovation

821 North Pennsylvania

Indianapolis, IN

BIDS DUE TO KP MEIRING: Thursday Aug 11, 2011 @ 2:00 PM

Invitation to Bid

BURTON APARTMENTS PLANS

BURTON APARTMENTS 8_1_11 VOL 1

BURTON APARTMENTS 8_1_11 VOL 2

BURTON Addendum No 01

BURTON Addendum No 02

BURTON Fire Damage Re-Framing Plan

 

 

Mustang Ranch Re-Bid

30th Street & MLK Blvd

Indianapolis, IN

BIDS DUE TO KP MEIRING: Monday April 9, 2012 @ 4:00 PM

Mustang Ranch -ReBid Drawings_3-26-12

Mustang Ranch-ReBid Specs_3-29-12

 

Englewood CDC Facade Renovation

2834 East Washington Street

Indianapolis, IN 46201

Englewood CDC Bid Set 2-28-12

Englewood CDC Facade Specs 2-28-12

 

Discovery Hall Tenant Improvements

Indiana Fair Grounds

1202 East 38th Street

Indianapolis, IN 46205

BIDS DUE TO KP MEIRING: Tue July 19, 2011 @ 4:00 PM

Discovery Hall Tenant Improvements Invitation to Bid

DHTF Site Plans

DHTF Architectural-Interior Design

DHTF MEP Plans

DISCOVERY HALL 1 SPECIFICATIONS VOL 1

DISCOVERY HALL 1 SPECIFICATIONS VOL 2

DHTF Addendum 1 Corrected

St Johns County Work Release Bldg

SJC Sheriff's Office Complex

St Johns County, FL

BIDS DUE TO KP MEIRING: Tuesday April 12, 2011 @ 2:00 PM

SJCWRHF-BIDSET-DRAWINGS 02-28-11 and Addenda Sheets

SJCWRHF-BIDSET-SPECIFICATIONS 02-28-11 and Addenda Sections

THE FOLLOWING ADDENDA ARE AVAIBLE FORE VIEWING AND DOWNLOAD AT www.demandstar.com:

SJC Work Release Inmate Facility Pre-Bid Sign-In Sheet

SJC Work Release Inmate Facility Addendum#1 Pre-Bid Conference Notes

SJC Work Release Inmate Facility Addendum#1

SJC Work Release Inmate Facility Addendum#2 Clarifications

SJC Work Release Inmate Facility Addendum#2 Security Communications Topography

Fountain View Senior Apartments

1044 Shelby Street

Indianapolis, IN 46203

BIDS DUE TO KP MEIRING: Wednesday May 11, 2011 @ 12:00 NOON

Invitation to Bid

Fountain View Apartments Complete Drawings

Fountain View Senior Apartments Complete Specs

Fountain View Addendum-01

Fountain View Addendum-02

Fountain View Unit Price and Alternates Bid Form

Exterior Pictures

Interior MEP Pictures

Discovery Hall Renovation Phase III

Indiana State Fair Grounds

1202 East 38th Street

Indianapolis, IN 46205

Bids Due to KP Meiring: Extended to Monday November 1, 2020 @ 4:00 PM

Invitation to Bid

Discovery Hal lPhaseIII Vol1 Specifications

Discovery Hall PhaseIII Vol2 Specifications

Discovery Hall PhaseIII - Plans

DH Phase 3 Addendum 1

DH Phase 3 Addendum 2

DH Phase 3 Addendum 3

DH Phase 3 Addendum 4

St George Apartments Renovation

2101 Boulevard Place

Indianapolis, IN 46207

Bid Tabulations for Previous Bid Packages:

St George Apts Published Bid Tab Packages 1 & 2 06-15-10

St George Apts. Published Bid Tab Packages 4, 5, 6, 9, 10 & 11 07-16-10

Three Phase Construction Sequencing Plan

SGA Plan Drawings -FULL

SGA Specification -FULL

1009-individual-PDFs

Addendum No A-1

Addendum No A-2

Addendum No A-3

Addendum No A-4

Addendum No A-5

SGA Masonry Restoration Plan 1009-a51

SGA 1009-Arch-Dir-#1-2010-06-18

ASI 2010-09-28 Field Items (2)

ASI #1 Electrical

HVAC RFP

HVAC RFP ADDENDUM NO BP-1

Phase 4 - Common Area Improvements

110623 SGA Invitation to Bid Courtyard Landscaping

Dwgs-Parking Lot & Courtyard Landscape Plan

2011-06-23 Courtyard Looking East

2011-06-23 Courtyard Looking West

110706 kpm SGA Phase 4 Invitation to Bid New Aluminum Entry Door

A1.1 New ADA Entry Door Plan

St George Submittals Approved for Use

Cabintery -HPL Tops-Pulls-Toe Kick Approved as NOTED-Certified

Appliances-APPROVED-Certified

Doors Frames Hardware Approved as NOTED-Certified

Plumbing Approved as NOTED-Certified

Electrical Approved as NOTED-Certified

Paint-Sherwin Williams Approved as NOTED-Certified

Old Kings Elementary School Renovation

OKES Invitation to Bid

OKES Spec Book

OKES Admin Bldg Addtn-Architectural

OKES Admin Bldg Addtn-Structural

OKES Admin Bldg Addtn-Mechanical

OKES Admin Bldg Addtn-Plumbing

OKES Admin Bldg Addtn-Electrical

OKES Admin Bldg Addtn-Fire Protection

OKES Add No 1_12-30-09

OKES Add No 2_01-06-10

Old Kings Elementary Pre-Bid Pictures

OKES Utility Plan issued at Pre-bid

OKES Non-Contractual Draft Schedule

Vendor Owner Direct PO ODPO Request

Harrison Grille Renovation

The Columbia Club

121 Monument Circle

Indianapolis, IN 46208

Invitation to Bid

Harrison Grille Bid Form

Harrison Grille Plans and Specifications

Crown Point Interior Renovations

345 West 38th Street

Indianapolis, IN

Invitation to Bid

Invitation to Bid Value Engineering

Addendum 1

Addendum 2 - Value Engineering

Unit Mix and Kitchen Types - Value Engineering

CP Kitchen VE Plans - Value Engineering

Unit Mix and Phasing Schedule

Crown Point ARCH-CP-INT PLANS

Pictures

Common Area ; Basement ; B West Storage ; B East Storage ; B Laundry

B01 ; B03 ; B04

Apartment 102 ; Apartment 104 ; Apartment 106 ; Apartment 107 ;

Apartment 109 ; Apartment 110 ; Apartment 111 ; Apartment 112 ;

Apartment 301 ; Apartment 302 ; Apartment 305

CASCADE HIGH SCHOOL SCIENCE LAB

Low General Contractor: KP Meiring Company

090130 Cascade H.S. Science Lab Reno. ITB

CASCADE SCIENCE LAB SPECS - click here

Cascade Science Lab Architectural Plans - click here

Cascade Science Lab Plumbing Plans - click here

Cascade Science Lab Mechanical Plans - click here

Cascade Science Lab Electrical Plans - click here

Addendum 1 - click here

Addendum 2 - click here

Addendum 3 - click here

090129 CSLR Pre bid Meeting Agenda

090223 CSLR Pre Award Agenda-Notes

090319 CSLR Pre Construction Meeting Minutes

Cascade Performance and Payment Bonds

Improvement Location--Building Permit Number 20090146E

Submittals:

081113-181416-187100 - 02 - Door Schedule Schmidt REVIEWED

081113-01 HMF Cut Sheets Schmidt REVIEWED

081416-01 Flush Wood Door Cut Sheets Schmidt REVIEWED

087100-01 Hardware Cut Sheets Schmidt REVIEWED

088000 - Glazing Schmidt Reviewed

089000 - Louvers and Vents Schmidt REVIEWED

092216 - Non Structural Metal Framing Schmidt Reviewed

092900 - Gypsum Drywall Schmidt Reviewed

095113 - Acoustical Panel Ceilings Schmidt Reviewed

099123 - Interior Painting Schmidt Reviewed

099600.99 High Performance Coatings Schmidt Reviewed

101100 - Visual Display Surfaces Schmidt Reviewed

123553-01 - Lab Casework - Schmidt Reviewed

123553 - Lab Caswork FINAL CLEAN SET CONST DWGS 5-21-09

220500 thru 230523 Plumbing Submittals Schmidt Reviewed

220523 - 01General Duty Valves for Plumbing Schmidt REVIEWED

220553 - Identification for Plumbing Schmidt Reviewed

220700 - Plumbing Insulation Schmidt Reviewed

221119 - Domestic Water Piping Specialties Schmidt Reviewed

221319 - Sanitary Waste Piping Schmidt Reviewed

224500 - Emergency Plumbing Fixtures Schmidt Reviewed

230519 - Thermometers and Gauges Schmidt Reviewed

230700 - HVAC Insulation Schmidt Reviewed

230900 - Building Management System Schmidt Schmidt Reviewed

231123-01 - Facility Natural Gas Piping Schmidt REVIEWED

232113 - Hydronic Piping Schmidt Reviewed

232113 - Metal Ducts Schmidt Reviewed R&R

233300 - Air Duct Accessories Schmidt Reviewed R&R

233423 - HVAC Power Ventilators Schmidt Reviewed

233713 - Diffusers Grills and Registers Schmidt Reviewed

238223.99 - Vertical Unit Ventilators Schmidt Reviewed

238223.99 - VUV Wiring Diagram

260519 - Low Voltage Cables Schmidt Reviewed

260533 - Raceways and Boxes Schmidt Reviewed

262416 - Panel Boards Schmidt Reviewed

262726 - Wiring Devices Schmidt Reviewed

262816 - Enclosed Switches and Cirtuit Breakers Schmidt Reviewed

271500 - Communication Horizontal Cabling Schmidt Reviwed

 

CRC Sandwich Shop

081020 CRC Invitation to Bid - click here for Invitation

Contract Documents:

Cover Sheet

A1.1 Demo & Lifesafety Plans

A1.2 Construction Plan & RCP

MP1.1 Mechanial & Plumbing General

MP1.2 Mechanical & Plumbing General

M2.1 Mechanical Floor Plan

P1.2 Plumbing Specification Plan

P1.3 Plumbing Details

P2.1 Plumbing Demo, Domestic Water & DWV

P2.2 Waste & Water Riser Diagrams

E0.1 Electrical General

E0.2 Electrical Requirements

E2.1 Electrical Power & Lighting Plans

E2.2 Electrical Raceway Details

E2.3 Electrical Riser Diagrams

CRC Addendum 1 Wage Decsion 7-25-08

CRC Addendum 2 Resident Certification of Eligibility

CRC Addendum 3 Section 3 General Contractors

CRC Addendum 4

Submittals:

Kitchen Equpment Cut Sheets Cafe

Grease Trap

Floor Finish Plan

Jefferson Apartments

09/01/12 Jefferson Apartments Renovations - click here for invitation

Jefferson Apartments Specs - click here for Div 0-Div 14

Jefferson Apartments Specs - click here for Div 15-Div 16

Jefferson Apartments 3D Exterior Views -click here

Jefferson Apartments Cover Sheet-Index - click here

Jefferson Apartments Foundation, Struct, Demo Plans -click here

Jefferson Apartments Architectural Plans - click here

Jefferson Apartments Plumbing Plans - click here

Jefferson Apartments HVAC & Fire Protection Plans - click here

Jefferson Apartments Electrical Plans - click here

Jefferson Apartments Updated Sheet F1.1 - click here

Jefferson Apartments Updated Sheet F1.2 - click here

Jefferson Apartments Civil Plans - click here

Jefferson Apartments Addenda 1 - click here

Jefferson Apartments Addenda No 2 - click here

Jefferson Apartments Bid Clarification 1 - click here

Exhibit A - click here

Jefferson Apartments Dwelling Unit Plans

Moccasin Slough Park

Clay County, FL

Bid Results: KP Meiring Company has been awarded the Project

Bid Tabulation

Moccasin Slough Park Cover Sheet

C1 - Drawing Index Legend and General Notes

C2 - Existing Conditions Plan

C3- Site Layout and Geometric Plan

C4 - Site Layout and Geometric Plan

C5 - Typical Sections

C6 - Site Grading and Drainage Plan

C7 - Site Grading and Drainage Plan

C8 - Water and Electric Plan

C9 - Erosion Control Plan

C10 - Erosion Control Details

C11 - Traffic Control Plan

C12 - Park Site Details

C13 - Park Equipment Layout and Details

C14 - Hexagonal Concrete Pad and Details

C15 - Boardwalk Details & Entrance Plan - Profile

C16 - Elevated Boardwalk Plan Section & Notes

L1 - Site Landscape Plan

L2 - Site Landscape Plan

MT1 - Tree Mitigation Plan & Tables

MT2 - Tree Mitigation Plan & Tables

A1 - Picnic Pavilion Plan & Schedules

A2 - Picnic Pavilion Details & Elevations

Addendum 1 Sheet 1 - Site Grading and Drainage

Addendum 1 Sheet 2 - Excercise Stattion Layout and Details

Addendum 1 Sheet 3 - Handrail Support Center of Long Span